Concrete
10 checks · PDF · XLSX
Concrete Pre-Pour Inspection Checklist
A pre-pour inspection is the last structured check before work becomes concealed by concrete. Record each verdict, add site notes, and export a project-ready inspection record.
Concrete
5 checks · PDF · XLSX
Concrete Post-Pour Inspection Checklist
Post-pour checks create an early record of concrete condition and curing controls while defects can still be investigated and corrected.
Structural steel
6 checks · PDF · XLSX
Structural Steel Inspection Checklist
Use this checklist to make fabrication and erection checks consistent before structural steel work is accepted or concealed.
MEP
6 checks · PDF · XLSX
MEP Rough-In Inspection Checklist
MEP rough-in inspections reduce rework by checking coordinated service installation before ceilings, walls, and shafts are closed.
MEP
5 checks · PDF · XLSX
Electrical Rough-In Inspection Checklist
This checklist provides a consistent first-fix electrical inspection record. Always align it with approved drawings and local electrical requirements.
Waterproofing
5 checks · PDF · XLSX
Waterproofing Inspection Checklist
Waterproofing defects are expensive to investigate after finishes are installed. Use this hold-point checklist before protection boards, screeds, or finishes conceal the system.
These checklists provide general operational guidance. Adapt them to the contract documents, approved drawings, specifications, inspection and test plans, method statements, manufacturer requirements, and local regulations that govern your work.