Materials — Overview

Keep one numbered register of the materials approved for your project — the manufacturer, the brand and the suppliers everyone on site is meant to use.

Every project runs on a short list of materials that have actually been signed off — the grade of concrete, the brand of rebar, the supplier the client accepted. Approved Materials is that list: numbered, kept in one place, and readable by everyone on the project.

The Approved Materials register — what this project is allowed to use, at a glance

The Three Screens

ScreenWhereWhat It's For
Approved MaterialsSidebar → Approved MaterialsThe register. Read-only, open to everyone on the project.
Approved Materials (Admin)Sidebar → Admin → Approved MaterialsWhere an approval is created and removed.
Materials CatalogSidebar → Admin → Materials CatalogBrowse your organisation's material library.

Where the Materials Come From

Your organisation is set up with a material catalogue — 555 items across 13 CSI MasterFormat divisions plus a general-consumables group, from Concrete (03) through Utilities (33), with cement, safety gear and fuels under General & Consumables (00). You don't build that library; you approve from it.

Approving takes a catalogue item and pins the project-specific facts to it: which manufacturer, which brand, and which of your vendors may supply it. That produces a record with a submittal number — MS-001, MS-002, and so on.

Approved means approved

Creating the record is the approval. There is no submit-for-review step, no reviewer queue and no rejection — an approval exists on the project, or it has been removed.

What an Approval Records

FieldRequiredWhere It Comes From
Material, spec, unit, CSI codeCopied from the catalogue item you pick
ManufacturerYesYou type it — e.g. UltraTech Cement, Tata Steel, JSW
Brand / Trade NameNoYou type it — e.g. Tiscon, UltraCrete
Approved Supplier(s)NoPicked from the project's vendors
RemarksNoFree text, up to 1,000 characters

From Approval to Stock

An approval is the gate into Resources. Nothing can be stocked, delivered or consumed on the project until it has been approved here first.

text

Naming suppliers on the approval pays off downstream: when you record a delivery for that material, the vendor list is narrowed to the suppliers you approved.

Accessing Materials

  • Approved Materials in the sidebar opens the register — every role on the project can read it
  • Admin → Approved Materials is where approvals are created and removed
  • Admin → Materials Catalog is where you browse the library

The Admin screens are desk work

Both Admin screens are hidden at phone width and need full material permissions. If they aren't in your sidebar, ask an organisation owner.

Next Steps

New to this? Start with the Getting Started guide for the catalogue-to-inventory round trip. Then: