Approved Materials — Overview

The two Approved Materials screens — the read-only register the whole project sees, and the admin view where approvals are created and removed.

Approved Materials exists twice in the sidebar, and the difference matters. Approved Materials in the main navigation is the register — everyone on the project can read it, nobody can change it. Admin → Approved Materials is the working copy where approvals are created and removed.

The Project Register

The register — the answer to 'are we allowed to use this?'

This is the page to send a site engineer to when the question is "which cement are we on?" or "who's allowed to supply this?". It's a flat list — no editing, no row menu, nothing to click into.

ColumnWhat It Shows
SubmittalThe record's number on this project — MS-001, MS-002
MaterialThe catalogue name — hover it to see the specification
CSI codeThe catalogue code, e.g. 03.30.002
CategoryThe CSI category the item belongs to
ManufacturerThe approved maker
SuppliersThe approved vendors
UnitThe material's default unit — m³, ton, bags, kg, nos, m², linear_m or litres
ApprovedThe date the material was approved

Spec and Brand are columns too, hidden to start with — bring them back from the Display menu.

Finding Something

One search box. It matches the material name, the submittal number, the manufacturer, the CSI code, the specification, the brand and the approved supplier names — so typing a vendor's name finds the materials that vendor is approved for.

The register opens grouped by Category; switch Group to Manufacturer to see each maker's approvals together.

On a Phone

At phone width the table becomes stacked cards, each built from the same columns — submittal number, material, CSI code, manufacturer, suppliers and the rest.

Nothing Listed Yet

An empty register reads "No approved materials yet""Your project admin will add approved materials here. Check back soon." That's the normal state on a brand-new project: someone with material permissions has to approve the first item before anything shows up.

The Admin Register

Admin → Approved Materials — the same list, plus the controls

Same columns, with two differences: Unit is replaced by a Status badge — an approval created here starts out Approved — and each row carries a action column. Above the table sits Add Approved Material, and tabs split the list into All, Pending and Approved.

Narrowing the List

The Filter control above the table offers Category and Manufacturer, each a multi-select built from the values actually present in the list — so on a steel-heavy project the Manufacturer filter shows the steel makers you've approved and nothing else. Tick as many as you need; each active filter shows as a removable chip with a Clear control beside it, and a filtered-empty list reads "No approved materials match current filters."

Filters are built from what's in your list, not a fixed vocabulary

The search box works as it does on the project register — material name, submittal number, manufacturer, CSI code, spec, brand and supplier names. The list opens grouped by Category; Group also offers Status and Manufacturer.

What You Can Do From a Row

Select rows with the checkboxes and a bar appears with the count and Delete. The menu on a single row offers Delete. Either way you're asked to confirm before anything is removed.

Reference — Submittal Numbers

Numbers are per project and zero-padded to three digits: MS-001, MS-002, MS-003. The next number is one past the highest currently on the project, so removing the most recent approval frees its number for the next one you create.