Getting Started with Safety

A complete walkthrough — deliver a toolbox talk, run a safety walk, raise a permit, and report an incident, then track it all from the Hub.

This guide walks you through the Safety module end to end — a toolbox talk, a safety walk, a permit to work, and an incident — so you can see how each workflow behaves and how the Hub ties them together.

Quick Summary
  1. Open the Safety Hub to see what needs attention
  2. Log a toolbox talk and route it for sign-off
  3. Start a safety walk and log observations as you go
  4. Request a permit for hazardous work and get it approved
  5. Report an incident, then investigate and close it
  6. Come back to the Hub to track open items

Before You Begin

Prerequisites

Anyone on the project can report incidents and log walk observations. Delivering talks, approving permits, and investigating incidents are typically done by a safety officer or above. Your project already comes with permit templates (hot work, work at height, excavation, and more) and default safety policies — you don't need to set anything up first.

1

Open the Safety Hub

Click Safety in the sidebar. The Hub is your safety console:

  • The KPI strip shows open incidents, active permits, talks this week, and open walk findings
  • The needs-attention feed lists what to act on — open incidents, expiring permits, and talks awaiting sign-off
  • The incident trend chart shows the last 8 weeks

Everything on the feed is a deep link — tap a row to jump straight to the record.

Safety Hub with KPI strip, needs-attention feed, and incident trend
The Safety Hub — start here to see what needs your attention
2

Log a Toolbox Talk

Toolbox talks record a pre-work safety briefing and who attended:

  1. Go to Safety → Toolbox Talks and click Log talk (or use the + button on a phone)
  2. Pick a topic (e.g. Fall Protection) and add a location
  3. Record attendance — a headcount or named attendees
  4. Add any notes and photos, then submit

The talk enters a cascade sign-off — it routes through the configured roles (by default: deliverer → PMC → safety head). Each role acknowledges or approves it until it's closed.

Log toolbox talk panel with topic, location, attendance, and notes
Logging a toolbox talk — topic, location, attendance, and evidence
3

Run a Safety Walk

Safety walks are quick, ad-hoc site inspections built around observations:

  1. Go to Safety → Safety Walks and click Start walk
  2. Give it a name (e.g. "Morning walk — Tower A") and start
  3. As you walk, tap Log observation for each thing you see:
    • Choose a severity — good, low, medium, high, or critical
    • Describe what you saw and attach a photo
    • Optionally capture your location
  4. Turn any observation into a safety issue or escalate it to an incident
  5. When you're done, tap Complete walk
Completed safety walk showing observations with severity badges and actions
A completed walk — observations rated by severity, ready to promote or escalate
4

Request a Permit to Work

Permits authorise hazardous work for a fixed time window:

  1. Go to Safety → Permits and click Request permit
  2. Choose a template (hot work, work at height, excavation, confined space, lifting, electrical isolation)
  3. Set the title and validity window (valid from → valid to)
  4. Record the hazards and controls, assign the approver, and attach any documents
  5. Submit — the permit is pending until the approver signs off

Once approved, the permit becomes active. It flags as expiring within 24 hours of its end time and expired once the window passes. Approvers can reject (optionally raising a safety issue for the requester), and requesters can extend or close an active permit.

Active permit detail with status strip, validity window, checklist, and approval timeline
An active permit — validity window, requirements checklist, and approval timeline
5

Report and Investigate an Incident

Incidents capture near misses, injuries, and damage:

  1. Go to Safety → Incidents and click Report incident
  2. Pick a type (near miss, first aid, lost time, property damage, environmental, and more)
  3. Record when and where it happened and a clear description
  4. Add evidence, flag a stand-down if work must stop, and mark if it's regulatory reportable
  5. Submit — the incident is reported

To close it out, open the incident and work the investigation panel:

  • Record the root cause
  • Add corrective actions with owners and due dates
  • Lift the stand-down when it's safe

Depending on your policies, an incident can't be closed until the root cause is filled and every corrective action is done.

Incident under investigation with report snapshot, root cause, and corrective actions
Investigating an incident — root cause and corrective actions gate the close-out
6

Track It All from the Hub

Everything you just created rolls up to the Safety Hub:

  • Open incidents and expiring permits appear in the needs-attention feed
  • Talks awaiting sign-off are listed with a deep link
  • The incident trend updates automatically

Come back to the Hub each day to see what still needs action.

Next Steps

Now that you've seen the full cycle, dig into each area: