WBS — Overview

The work breakdown for your project — phases, activities, tasks and subtasks, numbered and scheduled, read through seven views on one page.

The WBS — work breakdown structure — is the programme itself. Every piece of work on the project sits in one hierarchy: Phase → Activity → Task → Subtask. Each item carries its own WBS code, a status that comes from a workflow, dates, effort and an assignee. Seven views read that same breakdown in different ways, so the planner, the site engineer and whoever runs Monday's look-ahead meeting are all working off the same records.

Open it from WBS in the project sidebar.

The Outline view — the breakdown as a tree, with rolled-up dates on the parent rows

One Breakdown, Seven Views

There is one set of work items. What changes is how you read them. The view you pick is written into the address bar, so a link you paste into a message opens on the same view you were looking at.

ViewWhat it's for
OutlineThe breakdown as a tree — indent guides, WBS codes, expand and collapse, drag to reorder or reparent
TableThe same items as a spreadsheet grid, with per-column filters and inline editing
BoardColumns by status, one card per item — drag a card to change its status
TimelineThe Gantt: bars, dependency lines, float, critical path, today marker and the baseline
CalendarMonth, Week or Agenda, with items spanning the days they run across
LookaheadThe next few days as a day strip — the short-interval, site-meeting view
WorkloadOne row per project member, allocated effort against their capacity

Search, filters, grouping, sorting and display options live in the toolbar above all seven, so what you set up follows you as you switch.

The Hierarchy

TypeSits underCan contain
Phasenothing — top level onlyActivity
ActivityPhaseTask
TaskActivitySubtask, Issue
SubtaskTasknothing
IssueTasknothing

Only a Phase can sit at the top level, so an empty project starts with one. After that, the type of a new item is decided by where you put it — add an item under a Phase and you get an Activity, add one under an Activity and you get a Task.

Issues are their own module

The Issue type is the same record the Issues module owns. An issue raised here shows up on its parent task's Issues tab and in the Issues module — it does not appear in the seven WBS views. See Issues.

Where Things Happen

You want toGo to
Add work, reorder it, reparent itThe Outline view
Edit a lot of fields quicklyThe Table view
Move work alongThe Board view, or the status chip on any row
Commit and compare a planTimeline — set a baseline, then read planned against actual
Brief the weekLookahead
See who is over-committedWorkload
Open the full record — tabs, dependencies, attachmentsPress Space for the peek panel, or Open at the end of the row

Press Space on a focused row to open the peek panel without leaving the view. It carries the status control, the item's key facts and its actions.

Next Steps

New to the WBS? Start with the Getting Started guide to build a breakdown from an empty project. Then: