Quality
Non-conformance reports, corrective actions and internal audits for every project — each decision under a name, each fix checked, each record with its trail. ISO 9001 ready.
From a nonconformance to a cause dealt with
The records a site quality system runs on — what went wrong, what was decided, what was done and whether it worked.
Every nonconformance, in one register
Work that did not meet its requirement goes on the record as a non-conformance report — what is wrong, the requirement it missed, where it is and how serious it is. The register shows every NCR on the project, grouped by where it stands.
- Raised by hand, from a defect, from a failed inspection item or from an audit nonconformity
- Severity from observation to critical, with the reference standard and the requirement
- Views for all, open and ended NCRs
- Containment recorded under the name of the person who did it
A decision, under a name
Someone whose role can approve NCRs gives the disposition — use as is, rework, repair or reject. A repair or use-as-is is recorded as a concession under the accepter's name, with the client's consent when the client agreed.
- Four dispositions: use as is, rework, repair, reject
- Concessions recorded under the accepter's name
- Client consent recorded against the member who gave it
- A rework or repair is checked before the NCR closes
Corrective actions that are checked
When an NCR could happen again unless its cause is dealt with, it gets a corrective action: the root cause, the steps and who does each. When every step is done, an effectiveness check is booked 20 working days later to ask whether the steps stopped the problem coming back.
- Root cause, then steps with an owner each
- Effectiveness check booked 20 working days after the last step
- Effective closes it; not effective sends it back for more work
- Every move kept in the corrective action's run history
Internal audits against a published checklist
Plan an internal audit with its scope, auditor and process owner against a published checklist, and enter findings as the audit goes. A nonconformity found in an audit raises an NCR of its own and opens the corrective action from there.
- Scope, auditor, process owner and checklist on each audit
- Findings as nonconformity, observation or opportunity
- A nonconformity raises an NCR in one step
- Each audit and finding carries its own trail
More in the Quality module
Everything else the module carries, on the record.
- Evidence pack
- A sample of the project's quality records in a period — NCRs, corrective actions, audits and findings — with their trails, as one zip file, after a check that every sampled trail is intact.
- Run history on every record
- Each NCR, corrective action and audit keeps every move, sign-off and rule with who acted, when and under which permission. Entries are only added and chained, so the history is tamper-evident.
- Your company's quality workflows
- The NCR, corrective action and audit workflows live in Settings → Workflows with the rest, changed through a test run and an approval.
- Waiting on you
- An NCR's disposition and the check of its rework or repair, and a corrective action's effectiveness check, wait for the right person in My approvals.
- Linked to the defect that raised it
- An NCR raised from an issue or a failed inspection item links back to it, so the trail runs from the site to the decision.
Every view of project quality
From the NCR register to the evidence pack — three working views.
Every nonconformance on the project, by severity and where it stands.
How it works
Three steps from a nonconformance to a cause dealt with.
Raise the NCR
From a failed inspection item, a defect, an audit finding or by hand: what is wrong, the requirement it missed, where, and how serious.
Why switch from paper NCR forms and spreadsheets?
Most sites keep NCRs on a form and a tracker sheet. Here's what breaks and what changes.
The old way
- NCR forms filed in a folder — nobody can say which are still open.
- Dispositions agreed on a call — no record of who accepted the concession.
- Corrective actions closed when the steps are ticked, never checked for whether they worked.
- Audit findings typed into a report that nothing links back to.
- Evidence for an audit gathered by hand the week before.
With Construction Hub
- One register of every NCR on the project, grouped by where it stands.
- Each disposition and concession recorded under the accepter's name.
- An effectiveness check booked 20 working days after the last step.
- An audit nonconformity raises its own NCR in one step.
- An evidence pack of sampled record trails, checked, in one zip file.
Frequently asked questions
Quality, documented
The help that opens inside the app, on the web: every screen, every status, and what each role can do.
Open the Quality docsInside the Quality docs
Works with
Inspections
Quality inspections with customizable templates and sign-off sized to the risk of the work.
Issues
Issue tracking from discovery to closure — quality, safety, and punch list categories in one register.
Workflows
Your company's workflow for issues, inspections, approvals, NCRs and corrective actions — tested, approved, then published.

See Quality in action
See how a nonconformance goes from the site to a decision, a corrective action and an effectiveness check.
Every decision on the record, under a name