Quality — Overview

Nonconformances, corrective actions and internal quality audits on a project, linked to the defects, inspections and findings they came from.

Quality is where a project keeps its nonconformances (NCRs), its corrective actions and its internal quality audits. Open Quality in the project menu: its page has a tab for each register, NCRs, Corrective actions and Audits, and you see the tabs for the registers your role can read.

Each record keeps its link to where it came from, so you can follow a problem from the failed inspection item that found it, through the decision about the work, to the change that stopped it coming back.

The three registers

RegisterWhat it holdsWhat happens on it
NonconformancesWork that did not meet its requirementContain it, give a disposition (rework, repair, use as is, reject), decide whether a corrective action is needed, close it
Corrective actionsThe cause of a problem and the steps that deal with itRecord the root cause, add and complete steps, then check later that the steps worked
Quality auditsAudits of a process against a published checklistPlan the audit, enter what it found, issue the findings, close it; build an evidence pack for an auditor

How the records connect

  1. A problem is found: a defect, a failed inspection item, or an audit finding. Raise NCR on it, or raise an NCR by hand from the register.
  2. The NCR records what is wrong and what was done to contain it. Someone whose role can approve NCRs gives the disposition.
  3. Before the NCR closes, someone answers one question: could it happen again unless its cause is dealt with? If yes, a corrective action opens, linked to the NCR.
  4. The corrective action records the root cause and the steps. When every step is done, an effectiveness check opens 20 working days later to confirm the problem has not come back.

An audit nonconformity opens a corrective action by itself, and can raise an NCR too.

Who can do what

Your role on the project decides which registers you see and what you can do on them. Each register has its own read permission, and the decisions are kept for roles that can approve:

  • Giving an NCR's disposition, and voiding an NCR, needs a role that can approve NCRs.
  • Signing an effectiveness check, and voiding a corrective action, needs a role that can approve corrective actions.
  • Closing an audit while a nonconformity is still open, and requesting an evidence pack, needs a role that can approve quality audits.

If your role does not include a register, its page says You can't see … on this project. Ask a project manager if you need it.

Every record runs on a workflow

Nonconformances, corrective actions and audits each follow your company's workflow for that kind of record: its statuses, the moves between them, and the steps that wait on someone. The bottom of each record's page shows its Status, the Moves open to you, its Open steps, and its Run history: every move and signature, with who made it and under which permission.

A step waiting on you also appears in My approvals. Your company can change these workflows in the workflow builder.