Non-Conformance Report (NCR) Template

Raise a construction non-conformance report against the exact requirement, record disposition, containment, root cause, corrective action, and close-out.

  • NCR number and date
  • Requirement and non-conformance description
  • Severity and immediate containment
  • Disposition and approval
  • Root cause and corrective action
  • Preventive action
Not saved · this tab only3 of 25 fields started

PleoStack Construction · Free template

Non-Conformance Report (NCR) Template

NCR details

Identify the record, the work affected, and who is responsible for it.

The non-conformance

State exactly what requirement was not met, what was found, and how it was contained.

Disposition

Record the decision on the non-conforming item, its basis, and who approved it.

Corrective and preventive action

Address why this happened, what corrects it, and what stops it recurring.

Verification and close-out

Confirm the corrective action was carried out and the record can be closed.

Why an NCR has to trace back to a requirement

A non-conformance report exists to prove a decision, not just record a complaint: cite the exact specification clause, drawing revision, or contract requirement the work fails to meet, describe what was actually found, and attach the evidence — a photo, a test result, a measurement — that a reviewer can check independently.

Disposition (use as is, repair, rework, or reject and replace) needs a named approver and a justification tied back to the same requirement, because it is the record an auditor or client will ask to see again later. Root cause and corrective action address this occurrence; preventive action is the separate, harder question of what stops it recurring elsewhere on the project.

The free builder does not upload or retain your entries. Download or print the record before leaving, then route it through your project's quality-management and document-control process.

Questions

What is a non-conformance report used for?

It is raised when completed work, delivered materials, or a process do not meet a specified requirement — a quality, safety, or contract requirement. It records the requirement that was missed, the disposition decided on the non-conforming item, and the corrective and preventive action, and stays open until verification confirms the fix.

Who raises an NCR?

Typically the QA/QC inspector, site or quality engineer, or the client's consultant, usually during an inspection or a test. On some contracts a contractor's own quality team self-reports a non-conformance rather than waiting to be found.

What is the difference between disposition and corrective action?

Disposition decides what happens to this specific non-conforming item right now — use as is, repair, rework, or reject and replace. Corrective action addresses why it happened and what stops the same failure recurring. Both belong on the same record, but they answer different questions and are usually approved separately.

Does this NCR builder save my entries?

No. Everything you type stays in this browser tab only — nothing is uploaded or saved. Print or export the record before you close the tab, since refreshing it clears the form.