Construction Request for Information (RFI) Template

Prepare a complete construction RFI with project references, a precise question, cost and schedule impact, required response date, and response record.

  • Project and RFI number
  • Discipline and priority
  • Drawing and specification references
  • Question
  • Suggested resolution
  • Cost and schedule impact
Not saved · this tab only3 of 20 fields started

PleoStack Construction · Free template

Construction Request for Information (RFI) Template

RFI control

Give the query a unique identity and a clear response deadline.

References

Point the reviewer to the exact documents and location behind the question.

Question and impact

Ask one precise question and explain why the answer matters.

Response

Keep the answer, conditions, and responder on the same record as the question.

Use the RFI as a controlled project record

Agree the numbering, ownership, review, and distribution rules before the first record is issued. Complete fields consistently and cite the project documents that support each statement.

The free builder does not upload or retain your entries. Download or print the record before leaving, then store it under your project's document-control process.

Questions

What makes a good construction RFI?

A good RFI asks one precise question, cites the relevant drawings or specifications, explains the issue and potential impact, and states when a response is needed.

Is an RFI the same as a variation order?

No. An RFI requests clarification. A response may identify a change, but commercial authorization should follow the project's separate change-control process.

Is this a request for inspection?

No. This form is a request for information: a question to the designer or consultant. On many sites "RFI" also means a request for inspection, where the contractor asks for work to be inspected before it is covered up. That is a different form, with its own free builder.