Request for Inspection Template

Prepare a Request for Inspection for a hold or witness point: readiness checks, ITP references, and an inspection result record ready to print or export.

  • Request number and project
  • Inspection required date and time
  • Location, element, and discipline
  • ITP reference and hold/witness point
  • Drawing and specification references
  • Contractor's pre-inspection check
Not saved · this tab only4 of 25 fields started

PleoStack Construction · Free template

Request for Inspection Template

Request details

Identify the request and give the inspector a real, workable notice window.

Location and scope

Point to the exact work and the plan clause that governs this check.

Readiness and attachments

Show the inspector the work has already been checked before their visit is requested.

Inspection result

Keep the outcome on the same record as the request that asked for it.

Raise the request before the work is covered

A request for inspection exists to protect a hold or witness point: once concrete is poured or a service is closed in, the chance to inspect it is gone. State the exact location, element, and ITP reference, confirm the contractor's own pre-inspection is complete, and give the inspector a realistic date and time — most consultants need real notice, not a same-hour call.

Reference the inspection and test plan by number so the reviewer knows which checklist governs the point, and list the drawing and specification clauses the work must match. If a checklist for this discipline already exists among PleoStack's free construction inspection checklists — concrete, structural steel, MEP, and others — run it before submitting the request; a request backed by a completed self-check moves faster than one that isn't.

Keep the result on the same record as the request: who inspected, when, the outcome, and any conditions attached to an approval. If the result is a rejection, the corrective action and re-inspection date belong here too, so the history of the hold point stays in one document rather than scattered across messages.

Questions

Is a request for inspection the same as a request for information (RFI)?

No, although many sites use "RFI" for both. A request for information asks a designer or consultant a question about the design. A request for inspection asks the consultant or client's inspector to check completed work — often at a hold or witness point — before it is covered up or the next activity starts. For the question-and-answer form, use the separate RFI builder.

What is the difference between a hold point and a witness point?

A hold point stops work completely until the inspector attends and gives approval — for example, reinforcement before a pour. A witness point lets work continue if the inspector doesn't attend by an agreed time, but the inspector must still be given the opportunity to attend. The inspection and test plan should state which type applies to each activity.

What makes a request for inspection acceptable to the inspector?

One that gives enough notice, cites the correct ITP reference and drawing revision, confirms the contractor's own pre-inspection is complete, and states the exact location and element. A vague or last-minute request is the most common reason an inspection gets delayed or refused.

Does this free builder save my request or send it to anyone?

No. It composes the document in your browser only. Nothing is uploaded or saved by PleoStack, and there is no email or routing — print or export the finished request, then send and file it through your project's own process.