Widgets

Every widget on both dashboards — what it counts, how big it can be, and what it says when there is nothing to show.

There are 43 widgets in total — 25 for the Portfolio Dashboard and 30 for a project Dashboard. Each one belongs to a module, and each is a KPI tile, a Chart or a List.

Opening the Catalogue

Click Edit in the toolbar, then Add Widget. The catalogue opens as a panel on the right.

  • The header shows Active: n / n — how many widgets are on this dashboard, out of the ones available at this scope.
  • Search widgets matches on a widget's name, its description, its category and its module.
  • Widgets are grouped under module headings — Portfolio, Work Items, Quality & Issues, Inspections, Safety, Approvals, Materials, Manpower, Activity. Click a heading to collapse the group.
  • Add all and Remove all appear both at the top and on each module heading.
  • Clicking anywhere on a card toggles that widget on or off. A widget you add lands in the first free slot on the grid.
Each card shows its category and its default size

Sizes

Each card in the catalogue shows the size a widget starts at, written as columns × rows on the four-column grid.

CategoryStarting sizeCan it be resized?
KPI1 × 1No — KPI tiles are fixed at a single cell
Chart2 × 2Yes — up to four columns wide, and three or four rows tall depending on the widget
List2 × 2Yes — same limits as charts

Several widgets change what they show as they grow. At three columns or wider they switch to a wider arrangement — a two-column activity feed, vertical bars, a donut with the legend beside it rather than under it. At three rows or taller lists show more rows: Recent Inspections goes from six rows to ten, At-Risk Watchlist from five to ten, Recent Activity from eight up to fourteen.

Portfolio Dashboard Widgets

Available on the Portfolio Dashboard — all twenty-five read across every project in the organisation you can see.

WidgetTypeModuleWhat it shows
Active ProjectsKPIPortfolioProjects currently in progress, with the total underneath
Portfolio CompletionChartPortfolioCompletion for every project, lowest first
Overdue by ProjectChartPortfolioProjects ranked by how many work items are past their due date
At-Risk WatchlistListPortfolioProjects flagged for attention — overdue work, a recent safety incident, or on hold
Inspection CompletionKPIInspectionsShare of inspections marked complete, counted over every inspection, with the counts underneath
Inspection Pass RateKPIInspectionsCompleted inspections against those failed now, with pass and fail counts
Recent InspectionsListInspectionsThe latest completed and failed inspections — with an outcome filter in the card
Inspection ResultsChartInspectionsInspections performed, passed and failed in the period, the pass rate, and a weekly trend
First-Time Pass RateChartInspectionsShare of passed inspections that never went back, and how many rounds the others took
Inspector PerformanceListInspectionsOne row per person who recorded verdicts: runs, items judged, pass and fail %, send-backs caused, median turnaround
Failures by ChecklistChartInspectionsThe checklists — or single items — that fail most often, with fails out of checks
Inspection TurnaroundKPIInspectionsMedian time from an inspection starting to passing, with the slowest tenth
Sent Back and WaitingListInspectionsInspections that failed and nobody has re-judged yet, oldest first, with days waiting
Inspections by StatusChartInspectionsEvery inspection by where it stands today: not started, in progress, sent back, completed
Pass Rate by CollectionChartInspectionsPass rate for each inspection collection in the period
Pass Rate by ProjectChartInspectionsPass rate for every project in the period — Portfolio Dashboard only
Safety IncidentsKPISafety (beta)Incidents logged from daily logs across all projects in the last 30 days
Safety Incidents (30d)ListSafety (beta)The same incidents, listed rather than counted
Open ApprovalsKPIApprovalsApprovals awaiting sign-off across the portfolio
Approvals by ProjectListApprovalsPending approvals grouped by project
Material SpendKPIMaterialsTotal approved material spend across the portfolio
Spend by ProjectChartMaterialsApproved material spend per project
Manpower On SiteKPIManpowerThe latest reported headcount across active projects, taken from daily logs
Manpower by ProjectChartManpowerThe latest reported crew headcount for each active project
Recent ActivityListActivityThe latest actions across projects — rows that carry a link open it

Two widgets are named differently once placed

Approvals by Project shows Open Approvals as its card heading, and Spend by Project shows Material Spend. Both are on the grid — check what the widget is charting rather than the heading alone.

Project Dashboard Widgets

Available on a project's Dashboard — all thirty are scoped to that one project.

WidgetTypeModuleWhat it shows
Open Work ItemsKPIWork ItemsWork items not yet completed
Completion RateKPIWork ItemsShare of work items completed, with the counts underneath
Overdue ItemsKPIWork ItemsWork items past their due date and not yet completed
Work Item BreakdownChartWork ItemsA donut of work items grouped by status, with the total in the centre
Workload by AssigneeChartWork ItemsHow work items are spread across the team
Work Item VelocityChartWork ItemsCreated against completed over time, as a stacked area
Work Item TrendChartWork ItemsOpen against completed over time, as two lines
Completion WaffleChartWork ItemsCompletion as a grid of filled cells
Project RadarChartWork ItemsThree axes — Completion, Schedule and Quality
Open IssuesKPIQuality & IssuesIssues that are neither resolved nor closed
Issues by PriorityChartQuality & IssuesIssues grouped by priority
Issue Resolution FunnelChartQuality & IssuesIssues flowing through Created, Assigned, In Progress, Resolved and Closed
Inspection CompletionKPIInspectionsShare of this project's inspections marked complete
Inspection Pass RateKPIInspectionsCompleted inspections against those failed now
Recent InspectionsListInspectionsThe project's latest completed and failed inspections, with an outcome filter
Inspection ResultsChartInspectionsPerformed, passed and failed in the period, the pass rate, and a weekly trend
First-Time Pass RateChartInspectionsPassed first time, and rounds before passing for the rest
Inspector PerformanceListInspectionsEveryone who recorded verdicts on this project, with their figures
Failures by ChecklistChartInspectionsThe checklists or items on this project that fail most often
Inspection TurnaroundKPIInspectionsMedian start-to-pass time, with the slowest tenth
Sent Back and WaitingListInspectionsFailed inspections nobody has re-judged yet
Inspections by StatusChartInspectionsThis project's inspections by where they stand today
Pass Rate by CollectionChartInspectionsPass rate for each collection used on this project
Open PermitsKPISafety (beta)Active permits to work, plus any past their validity window
Permits Expiring SoonListSafety (beta)Active permits ordered by time to expiry, with a live countdown
Toolbox Talks This WeekKPISafety (beta)Toolbox talks delivered so far this week
Open Walk FindingsKPISafety (beta)Open safety findings raised from safety walks
Safety Severity BreakdownChartSafety (beta)A donut of safety-walk observations grouped by severity
Safety Incident TrendChartSafety (beta)Incidents recorded per week over the last eight weeks
Recent ActivityListActivityThe latest actions on this project

Safety widgets are beta

The six Safety widgets read from the Safety module, which is in beta.

Inspection Figures

Every inspection widget counts every inspection you can see, not just the newest ones. If your role only lets you see your own inspections, the figures are yours alone.

  • Performed is inspections started in the period; Passed is inspections completed in the period; Failed counts each time an inspection was sent back, so one that fails twice and then passes counts once as passed and twice as failed.
  • Pass rate is passed out of passed plus failed. First-time pass rate is the share of passed inspections that never went back.
  • Cancelled inspections are left out everywhere.

Widgets with Their Own Controls

A few widgets have dropdowns in their header. What you pick there is not saved with the dashboard.

WidgetControl
Inspection Results, First-Time Pass Rate, Inspector Performance, Failures by Checklist, Pass Rate by Collection, Pass Rate by ProjectThe period: 30 d, 90 d (the default) or Quarter
Inspector PerformanceRole: All roles, Performers, Checkers or Approvers
Failures by ChecklistGroup by Checklist or by Item
Recent InspectionsOutcome: All, Passed or Failed, each with its count. The subtitle keeps the full pass and fail split whatever you filter to
Inside Recent Inspections — one row per completed inspection, with its outcome dot and project

No other widget has a filter, a sort or a group-by.

When There Is Nothing to Show

A widget with no data says so rather than showing a zero. Some of the messages are worth recognising:

WidgetWhat it says
At-Risk WatchlistAll projects on track — nothing is overdue, on hold or carrying a recent incident
Safety Incidents (30d)No incidents — keep it up
Inspection Pass RateNo completed inspections, with the figure shown as a dash
Inspection ResultsNo inspections in the last 90 days. (or the period you picked)
Inspector PerformanceNobody recorded a verdict in the last 90 days.
Sent Back and WaitingNothing is waiting on a re-inspection.
Recent InspectionsNo completed inspections — or None passed / None failed when you have filtered to an empty set
Permits Expiring SoonNo permits expiring soon
Recent ActivityNo recent activity
Manpower On SiteNo recent crew reports — no daily log has been filed with a headcount
  • Getting Started — adding widgets and arranging the grid, step by step
  • Views — saving a layout, sharing it, and setting your default
  • Dashboard Overview — the two dashboards and how they differ

Questions

Can I put a project widget on the Portfolio Dashboard?

No. The two dashboards have separate widget catalogues. Add Widget only offers the widgets made for the dashboard you're on.

Can I change a chart's date range or filter it?

Only the inspection widgets have one. Most show a period dropdown (30 d, 90 d or Quarter), Inspector Performance filters by role, Failures by Checklist switches between checklists and items, and Recent Inspections shows All, Passed or Failed. Other widgets have no date or filter settings.

Can I make a KPI tile bigger?

No. KPI tiles stay at one cell. Charts and lists can be stretched from their bottom-right corner while you're editing.