Widgets
Every widget on both dashboards — what it counts, how big it can be, and what it says when there is nothing to show.
There are 43 widgets in total — 25 for the Portfolio Dashboard and 30 for a project Dashboard. Each one belongs to a module, and each is a KPI tile, a Chart or a List.
Opening the Catalogue
Click Edit in the toolbar, then Add Widget. The catalogue opens as a panel on the right.
- The header shows Active: n / n — how many widgets are on this dashboard, out of the ones available at this scope.
- Search widgets matches on a widget's name, its description, its category and its module.
- Widgets are grouped under module headings — Portfolio, Work Items, Quality & Issues, Inspections, Safety, Approvals, Materials, Manpower, Activity. Click a heading to collapse the group.
- Add all and Remove all appear both at the top and on each module heading.
- Clicking anywhere on a card toggles that widget on or off. A widget you add lands in the first free slot on the grid.
Sizes
Each card in the catalogue shows the size a widget starts at, written as columns × rows on the four-column grid.
| Category | Starting size | Can it be resized? |
|---|---|---|
| KPI | 1 × 1 | No — KPI tiles are fixed at a single cell |
| Chart | 2 × 2 | Yes — up to four columns wide, and three or four rows tall depending on the widget |
| List | 2 × 2 | Yes — same limits as charts |
Several widgets change what they show as they grow. At three columns or wider they switch to a wider arrangement — a two-column activity feed, vertical bars, a donut with the legend beside it rather than under it. At three rows or taller lists show more rows: Recent Inspections goes from six rows to ten, At-Risk Watchlist from five to ten, Recent Activity from eight up to fourteen.
Resize from a full-size window
Below 768 px of browser width the grid stacks widgets to fit, and moves and resizes made there are not saved. Adding and removing widgets works at any width.
Portfolio Dashboard Widgets
Available on the Portfolio Dashboard — all twenty-five read across every project in the organisation you can see.
| Widget | Type | Module | What it shows |
|---|---|---|---|
| Active Projects | KPI | Portfolio | Projects currently in progress, with the total underneath |
| Portfolio Completion | Chart | Portfolio | Completion for every project, lowest first |
| Overdue by Project | Chart | Portfolio | Projects ranked by how many work items are past their due date |
| At-Risk Watchlist | List | Portfolio | Projects flagged for attention — overdue work, a recent safety incident, or on hold |
| Inspection Completion | KPI | Inspections | Share of inspections marked complete, counted over every inspection, with the counts underneath |
| Inspection Pass Rate | KPI | Inspections | Completed inspections against those failed now, with pass and fail counts |
| Recent Inspections | List | Inspections | The latest completed and failed inspections — with an outcome filter in the card |
| Inspection Results | Chart | Inspections | Inspections performed, passed and failed in the period, the pass rate, and a weekly trend |
| First-Time Pass Rate | Chart | Inspections | Share of passed inspections that never went back, and how many rounds the others took |
| Inspector Performance | List | Inspections | One row per person who recorded verdicts: runs, items judged, pass and fail %, send-backs caused, median turnaround |
| Failures by Checklist | Chart | Inspections | The checklists — or single items — that fail most often, with fails out of checks |
| Inspection Turnaround | KPI | Inspections | Median time from an inspection starting to passing, with the slowest tenth |
| Sent Back and Waiting | List | Inspections | Inspections that failed and nobody has re-judged yet, oldest first, with days waiting |
| Inspections by Status | Chart | Inspections | Every inspection by where it stands today: not started, in progress, sent back, completed |
| Pass Rate by Collection | Chart | Inspections | Pass rate for each inspection collection in the period |
| Pass Rate by Project | Chart | Inspections | Pass rate for every project in the period — Portfolio Dashboard only |
| Safety Incidents | KPI | Safety (beta) | Incidents logged from daily logs across all projects in the last 30 days |
| Safety Incidents (30d) | List | Safety (beta) | The same incidents, listed rather than counted |
| Open Approvals | KPI | Approvals | Approvals awaiting sign-off across the portfolio |
| Approvals by Project | List | Approvals | Pending approvals grouped by project |
| Material Spend | KPI | Materials | Total approved material spend across the portfolio |
| Spend by Project | Chart | Materials | Approved material spend per project |
| Manpower On Site | KPI | Manpower | The latest reported headcount across active projects, taken from daily logs |
| Manpower by Project | Chart | Manpower | The latest reported crew headcount for each active project |
| Recent Activity | List | Activity | The latest actions across projects — rows that carry a link open it |
Two widgets are named differently once placed
Approvals by Project shows Open Approvals as its card heading, and Spend by Project shows Material Spend. Both are on the grid — check what the widget is charting rather than the heading alone.
Project Dashboard Widgets
Available on a project's Dashboard — all thirty are scoped to that one project.
| Widget | Type | Module | What it shows |
|---|---|---|---|
| Open Work Items | KPI | Work Items | Work items not yet completed |
| Completion Rate | KPI | Work Items | Share of work items completed, with the counts underneath |
| Overdue Items | KPI | Work Items | Work items past their due date and not yet completed |
| Work Item Breakdown | Chart | Work Items | A donut of work items grouped by status, with the total in the centre |
| Workload by Assignee | Chart | Work Items | How work items are spread across the team |
| Work Item Velocity | Chart | Work Items | Created against completed over time, as a stacked area |
| Work Item Trend | Chart | Work Items | Open against completed over time, as two lines |
| Completion Waffle | Chart | Work Items | Completion as a grid of filled cells |
| Project Radar | Chart | Work Items | Three axes — Completion, Schedule and Quality |
| Open Issues | KPI | Quality & Issues | Issues that are neither resolved nor closed |
| Issues by Priority | Chart | Quality & Issues | Issues grouped by priority |
| Issue Resolution Funnel | Chart | Quality & Issues | Issues flowing through Created, Assigned, In Progress, Resolved and Closed |
| Inspection Completion | KPI | Inspections | Share of this project's inspections marked complete |
| Inspection Pass Rate | KPI | Inspections | Completed inspections against those failed now |
| Recent Inspections | List | Inspections | The project's latest completed and failed inspections, with an outcome filter |
| Inspection Results | Chart | Inspections | Performed, passed and failed in the period, the pass rate, and a weekly trend |
| First-Time Pass Rate | Chart | Inspections | Passed first time, and rounds before passing for the rest |
| Inspector Performance | List | Inspections | Everyone who recorded verdicts on this project, with their figures |
| Failures by Checklist | Chart | Inspections | The checklists or items on this project that fail most often |
| Inspection Turnaround | KPI | Inspections | Median start-to-pass time, with the slowest tenth |
| Sent Back and Waiting | List | Inspections | Failed inspections nobody has re-judged yet |
| Inspections by Status | Chart | Inspections | This project's inspections by where they stand today |
| Pass Rate by Collection | Chart | Inspections | Pass rate for each collection used on this project |
| Open Permits | KPI | Safety (beta) | Active permits to work, plus any past their validity window |
| Permits Expiring Soon | List | Safety (beta) | Active permits ordered by time to expiry, with a live countdown |
| Toolbox Talks This Week | KPI | Safety (beta) | Toolbox talks delivered so far this week |
| Open Walk Findings | KPI | Safety (beta) | Open safety findings raised from safety walks |
| Safety Severity Breakdown | Chart | Safety (beta) | A donut of safety-walk observations grouped by severity |
| Safety Incident Trend | Chart | Safety (beta) | Incidents recorded per week over the last eight weeks |
| Recent Activity | List | Activity | The latest actions on this project |
Safety widgets are beta
The six Safety widgets read from the Safety module, which is in beta.
Inspection Figures
Every inspection widget counts every inspection you can see, not just the newest ones. If your role only lets you see your own inspections, the figures are yours alone.
- Performed is inspections started in the period; Passed is inspections completed in the period; Failed counts each time an inspection was sent back, so one that fails twice and then passes counts once as passed and twice as failed.
- Pass rate is passed out of passed plus failed. First-time pass rate is the share of passed inspections that never went back.
- Cancelled inspections are left out everywhere.
Widgets with Their Own Controls
A few widgets have dropdowns in their header. What you pick there is not saved with the dashboard.
| Widget | Control |
|---|---|
| Inspection Results, First-Time Pass Rate, Inspector Performance, Failures by Checklist, Pass Rate by Collection, Pass Rate by Project | The period: 30 d, 90 d (the default) or Quarter |
| Inspector Performance | Role: All roles, Performers, Checkers or Approvers |
| Failures by Checklist | Group by Checklist or by Item |
| Recent Inspections | Outcome: All, Passed or Failed, each with its count. The subtitle keeps the full pass and fail split whatever you filter to |
No other widget has a filter, a sort or a group-by.
When There Is Nothing to Show
A widget with no data says so rather than showing a zero. Some of the messages are worth recognising:
| Widget | What it says |
|---|---|
| At-Risk Watchlist | All projects on track — nothing is overdue, on hold or carrying a recent incident |
| Safety Incidents (30d) | No incidents — keep it up |
| Inspection Pass Rate | No completed inspections, with the figure shown as a dash |
| Inspection Results | No inspections in the last 90 days. (or the period you picked) |
| Inspector Performance | Nobody recorded a verdict in the last 90 days. |
| Sent Back and Waiting | Nothing is waiting on a re-inspection. |
| Recent Inspections | No completed inspections — or None passed / None failed when you have filtered to an empty set |
| Permits Expiring Soon | No permits expiring soon |
| Recent Activity | No recent activity |
| Manpower On Site | No recent crew reports — no daily log has been filed with a headcount |
Related
- Getting Started — adding widgets and arranging the grid, step by step
- Views — saving a layout, sharing it, and setting your default
- Dashboard Overview — the two dashboards and how they differ
Questions
Can I put a project widget on the Portfolio Dashboard?
No. The two dashboards have separate widget catalogues. Add Widget only offers the widgets made for the dashboard you're on.
Can I change a chart's date range or filter it?
Only the inspection widgets have one. Most show a period dropdown (30 d, 90 d or Quarter), Inspector Performance filters by role, Failures by Checklist switches between checklists and items, and Recent Inspections shows All, Passed or Failed. Other widgets have no date or filter settings.
Can I make a KPI tile bigger?
No. KPI tiles stay at one cell. Charts and lists can be stretched from their bottom-right corner while you're editing.