Material Detail Page
What you see inside a material's detail view — budget, stock stats, usage history, deliveries, and adjustments.
- Click any material row in the Inventory tab to open its detail page
- Top of the page: Unit Rate and Planned Quantity — the material's budget, editable in place
- Info panel (right): Material metadata — name, spec, category, unit, date added, approved vendors
- Stats cards: Current stock, total delivered, total consumed, total cost
- Budget progress: Visual bar showing cost against budget
- Tabs: Usage, Deliveries, Adjustments, QC Tests — each with a count badge
- Inline editing: Unit Rate and Planned Quantity can be edited directly
Full Guide
Navigating to a Material
Click any row in the Inventory table to open its detail page.
The page has a back button (← Resources) in the header to return to the Inventory tab.
Budget Fields
The two fields at the top of the page are the material's budget:
| Field | Description |
|---|---|
| Unit Rate | Budgeted cost per unit (₹) — editable |
| Planned Quantity | Total expected need — editable |
Change either value in place — a Save button appears in the page header as soon as you do. Click it to keep the change.
Info Panel (Material Info)
The Info panel on the right shows the material's core information:
| Field | Description |
|---|---|
| Name | Material name from the submittal |
| Spec / Grade | Grade or spec (e.g., M30 Grade, Fe500D) |
| Category | Material category |
| Unit | Measurement unit |
| Added | When the material was added to inventory |
| Approved Vendors | The suppliers named on the approved submittal |
Stats Cards
Four summary cards show key metrics:
| Card | What It Shows |
|---|---|
| Current Stock | Total delivered − total consumed ± adjustments |
| Total Delivered | Sum of the delivery quantities recorded against this material |
| Total Consumed | Sum of all usage log quantities |
| Total Cost | Sum of the delivery costs recorded against this material (₹) |
Budget Progress
A progress bar below the stats shows how your actual costs compare to your budget:
Budget Calculation
Budget = Unit Rate × Planned Quantity
If costs exceed the budget, the bar changes color to indicate over-budget status.
Tabs
Usage Tab
- Chronological list of all usage log entries
- Each entry: date, quantity consumed, remarks, who logged it
- Immutable records — can't be edited or deleted
Deliveries Tab
- All deliveries for this material
- Each entry: date, vendor, quantity, cost, approval status
- Clicking a delivery navigates to its detail page
Adjustments Tab
- All manual stock adjustments
- Each entry: date, direction (add/remove), quantity, reason, who adjusted
- Immutable records
QC Tests Tab
- Quality control test records for the material
- Each entry: test type, batch, result, observations, status (pending/passed/failed)
- Schedule Test adds a test; recording its result is where a certificate can be attached
Actions Available
| Action | Where | What It Does |
|---|---|---|
| Edit Budget | Top of the page (inline) | Update unit rate and planned quantity |
| Log Usage | Usage tab | Record material consumption |
| Adjust Stock | Adjustments tab | Manual stock correction |
| Schedule Test | QC Tests tab | Add a quality control test |
| Back to Inventory | Header back button | Return to the inventory list |
Related
- Inventory Overview — Back to the main inventory guide
- Stock Tracking — Understanding the stock formula
- Usage Logging — Recording consumption