Getting Started with Inspections

A complete walkthrough from building templates to executing your first inspection and reviewing results.

This guide walks you through the complete Inspections workflow — from setting up templates to running a field inspection, reviewing results across parties, and handling defects. By the end, you'll have a working inspection cycle.

Quick Summary
  1. Build checklist templates with items to inspect
  2. Group checklists into collections for multi-part inspections
  3. Create an inspection from a collection, name the inspector and any other parties
  4. The inspector records verdicts in the field → submits
  5. Routine work closes there; on quality-critical work the approver reviews → approves or sends back
  6. Failed items create quality issues → resolve → reinspect

Before You Begin

Prerequisites

Every project role except RFI Coordinator can open Inspections. Contractors and Subcontractors see only the inspections they created or are assigned to; Client Representatives and Viewers are read-only. Only the project owner can delete an inspection.

The inspection's workflow sets who signs, what happens on a failed item and what is re-judged on a reinspection. Admins see it under Admin → Workflows.

1

Set Up Your Templates

Before running inspections, create the checklists that define what to check:

  1. Go to Admin › Library and open the Checklist templates tab
  2. Click Create Checklist → enter a name (e.g., "Reinforcement Inspection") and select a category
  3. Add items — each item describes one thing to check:
    • Label: "Rebar spacing at 150mm c/c per drawing"
    • Severity: Critical, Major, Minor, or Observation
  4. Organize items into sections (e.g., "Main Bars", "Stirrups", "Cover")
  5. Click Create Checklist

Repeat for each checklist type you need — one for reinforcement, one for formwork, one for safety, etc.

Checklist builder — define what gets checked during inspections
2

Create a Collection

Collections group related checklists so you can run them together:

  1. Switch to the Collections tab
  2. Click Create Template → enter name (e.g., "Concrete Pre-Pour") → Next
  3. Add your checklists — select from the library, mark some as required
  4. Click Create Template — the collection is now available as a source when creating inspections
Collection editor — group related checklists for multi-part inspections
3

Create an Inspection

  1. Go to Inspections (main list page)
  2. Click New Inspection → the creation wizard opens
  3. Step 1 — Source: Select your collection (e.g., "Concrete Pre-Pour")
  4. Step 2 — Details: Set the inspection name (required) and the location (optional)
  5. Step 3 — Parties: The first party (labelled Performer) is the inspector. On a quality-critical checklist the last party is the approver, whose role must hold the approve permission for inspections — the step says so if it doesn't. Anyone named between them can view the inspection and takes no turn
  6. Click Create Inspection

The inspection appears in the list as Not Started.

Step 1 — select a collection or individual checklist as the inspection source
Step 3 — name the inspector first and, on quality-critical work, the approver last
4

Execute the Inspection (Inspector)

The inspector goes to the site and records results:

  1. Click the inspection in the list → the detail page opens
  2. Click Begin Inspection → checklist items appear with verdict buttons
  3. For each item:
    • Click Pass (✓) if it meets requirements
    • Click Fail (✗) if it doesn't — the fail page opens: say why it failed, add photos and a note, then pick what to raise
    • Click N/A (—) if the item doesn't apply
  4. For failed items → pick Raise an issue or Raise an NCR on the fail page, or Just record it, then Save failure
  5. Attach photo evidence in the item's detail sheet — click the item to open it
  6. When all items have verdicts → submit

On a routine checklist that completes the inspection. On a quality-critical one it moves to the approver.

The ready state — click Begin Inspection to start recording verdicts
In progress — record Pass, Fail or N/A; a failed item asks why before it is saved
5

Approve Quality-Critical Work (Approver)

Routine work closes on the inspector's verdict, so this step is only for a quality-critical checklist. The approver's turn is listed in My Approvals and opens the inspection:

  1. See all verdicts, notes, and evidence from the inspector
  2. Record your own verdict on every item
  3. If satisfied → Approve Inspection (status: Completed, verdict: Pass)
  4. If you fail any item, the button reads Send back with failures → triggers reinspection, cycles back to the inspector
Approver view — review the inspector's verdicts and make the final call
6

Handle Issues (If Any)

Failed items saved with Raise an issue become quality issues in the Issues register:

  1. Open Issues from the sidebar
  2. Find the issues linked to your inspection
  3. Assignee does the fix → clicks Mark Fixed
  4. When all issues are Fixed → the inspector can submit the reinspection
  5. When the inspector submits the reinspection → the Fixed issues close automatically
Issues — track defect resolution with status transitions
Row actions — the assignee marks an issue Fixed

Next Steps

Now that you understand the workflow:

Questions

Can I change the parties, the name or the location after I create it?

No. None of them can be edited once the inspection exists. If something is wrong, have it deleted and create a new one. The project owner can delete any inspection; anyone else only one they created, if their role allows deleting inspections.

Can one person run the whole inspection?

Yes, on a routine checklist. In the wizard's parties step, remove the Checker and Approver rows so one party remains. That inspection has a single Complete Inspection step and no review chain. Anyone whose role can work on inspections can record and submit a single-party inspection, not only the person named on it. A quality-critical checklist also needs an approver, so it needs at least two parties.

Does the inspector find out the inspection is waiting for them?

Yes. The inspector, in the first slot, is notified as soon as you press Create Inspection. On quality-critical work the approver is notified later, when it reaches them.