Inspection Execution — Overview

What the inspection detail page looks like and how to record verdicts, attach evidence, and submit.

The Inspection Detail page is where field work happens. You go through each checklist item, record a verdict, attach evidence if needed, and submit. On routine work the inspector's submit completes the inspection; on quality-critical work it goes to the approver.

Page Layout

The detail page has three main areas:

AreaWhat It Shows
Top barInspection name, status badge and progress bar. The submit button sits in the action bar at the bottom of the checklist
Main contentChecklist items in a table (desktop) or card view (mobile) with verdict buttons
Info panelRight sidebar with metadata — location, scope, parties, dates, verdict summary and linked issues

What You See Depends on Your Role

RoleView
Inspector (the Performer slot), on your turnVerdict buttons on each item — Pass ✓, Fail ✗, N/A —. Can record results and attach evidence.
Approver, on your turn (quality-critical checklist)The inspector's verdicts visible alongside your own verdict buttons. You're reviewing their work.
Not your turn, or named between the inspector and the approverRead-only view. You can see existing verdicts but can't change anything. A party named between the inspector and the approver views the inspection and takes no turn.
CompletedComparison table showing all parties' verdicts side by side, under a Pass outcome banner.

Ready State (Not Started)

When the inspector first opens an inspection that hasn't been started:

Ready state — preview the checklist before starting
  • A preview of checklist items is shown (read-only)
  • Click Begin Inspection to start — status changes to In Progress
  • Verdict buttons appear and you can begin recording

Recording Verdicts

Each checklist item has three verdict options:

VerdictSymbolColorNotes Required
Pass✓GreenOptional
Fail✗RedMandatory — explain the failure, unless you picked a reason under Why it failed
N/A—GrayOptional
In Progress — a failed item asks why before it is saved

Click the verdict button on the item row. To change a verdict, click a different button — the previous selection is replaced.

Item Detail Sheet

Click an item label to open the detail sheet (side drawer). The verdict itself is recorded on the item row — the sheet has no verdict buttons; its title shows the item's current verdict as a badge. The sheet carries:

  • Notes — optional observations; on a failed item this becomes a required Remark, optional once you have picked a reason under Why it failed (the reason says why; the remark is for anything more)
  • Measurement — only on an item authored to need a reading; the verdict won't save until it's entered. On an item with a spec you can also type the reading on the item row (see Verdicts & Evidence)
  • Evidence — photos from the camera or gallery
  • GPS Location — the position that will be recorded with the verdict, when the device gives one
  • A failed item is answered on the fail page, not here: why it failed, photos, the note and what to raise (see Failing an item)
  • Review History and Issues tabs — shown when earlier parties have recorded verdicts on the item, or issues are linked to it

The save button reads Save Details, Confirm Failure on a failed item, or Pass out of spec when you are passing a reading outside its spec.

Item detail sheet — notes, measurement, evidence and location for one item

Evidence

Attach photos to any checklist item:

  1. Open the item's detail sheet — click the item, or its Remarks button (Edit once the item has a verdict) — and go to Evidence
  2. Take a photo or select from gallery
  3. GPS coordinates are auto-captured from your device
  4. Up to five photos can be attached per item

Submission

When all items have verdicts:

  1. Click the submit button for your step — as the inspector, Complete Inspection when you are the only party and Submit for Review otherwise; as the approver, Approve Inspection. If the approver has failed any item, the button reads Send back with failures — the failed item is what sends it back to the inspector; there is no separate button for it.
  2. A confirmation dialog shows the verdict summary and any validation warnings
  3. Confirm → on a routine checklist the inspection completes; on a quality-critical one it goes to the approver

Validation requirements:

  • All items must have a verdict
  • Failed items must have notes, unless a reason was picked under Why it failed
  • Failed items must have evidence (when the workflow's Photo on a failed item rule requires it)

After submission, your verdicts become read-only. On quality-critical work the approver's turn is listed in their My Approvals.

An inspection started on an earlier workflow version also has Approve & Forward for each Checker in the middle (Who Signs an Inspection).

Cancelling an Inspection

An inspection that is no longer needed can be cancelled with Cancel Inspection at the top of the page, then confirmed. The button shows for the project owner, the person who created the inspection and anyone assigned a party on it, and only until the inspection is completed; a completed inspection can't be cancelled.

A cancelled inspection stays in the list with the Cancelled status and its audit trail, and nothing more can be recorded on it. Issues raised from it are released: once Fixed, they can be closed without waiting for a reinspection.

Mobile View

On phones the detail page always uses the card layout — one card per item, with the verdict buttons and the remarks button on the card. The List / Cards switcher is a desktop control and is hidden at phone width.

Next Steps

Questions

Are my verdicts saved as I go?

They're kept in this browser on this device until you submit. Close the tab and reopen the inspection on the same device, and your unsent verdicts come back. Nobody else sees them, and they don't reach the server until you press the submit button. On another device you start again.

Can I use it with no signal?

It's a web app in your phone's browser, and it needs a connection to save your work. Submitting sends every verdict, so do it where you have signal.

Why can't I press the verdict buttons?

It isn't your turn. On an inspection with more than one party only the person whose turn it is can record verdicts, even the project owner. Anyone named between the inspector and the approver views it and takes no turn. The banner and the Status column say whose turn it is.

Who can cancel an inspection?

The project owner, the person who created it, and anyone assigned a party on it, for as long as it isn't completed. Others don't see Cancel Inspection. A completed inspection can't be cancelled, but it can be reinspected.