Who Signs an Inspection
Who signs an inspection — the inspector on routine work, an approver as well on quality-critical work — and the rules each party works to.
An inspection's sign-off follows the risk of the work. A housekeeping walk and a pre-pour check don't need the same signatures: routine work closes on the inspector's verdict, and quality-critical work also needs an approver. Your company's inspection workflow sets this, and admins see it under Admin → Workflows.
Who signs
| Checklist | Who signs |
|---|---|
| Routine (safety walk, finishes, housekeeping) | The inspector |
| Quality-critical (concrete, steel, masonry and similar structural work) | The inspector, then an approver whose role holds the approve permission for inspections |
By default, concrete, structural, steel, reinforcement, formwork, masonry, waterproofing, foundation and piling checklists are quality-critical. A checklist can be set to quality-critical or routine either way in its template.
The parties on an inspection
The create wizard starts with three rows: the first is the inspector (labelled Performer), the last is the approver. Each party must be a different person, and every row needs a member before you can press Create Inspection.
- The inspector goes through each checklist item on-site, records Pass, Fail or N/A, adds notes (mandatory on a fail, unless a reason is picked under Why it failed) and attaches photo evidence. A failed item can raise a quality issue — pick Raise an issue on its fail page and, if you like, Who fixes it.
- The approver, on a quality-critical checklist, is the last party named. It needs at least two parties, and the last must hold the permission to approve inspections: the create dialog says so before you press Create, and the server refuses it either way. The permission is checked again on the sign-off and kept in the run history. Reassigning the last slot is checked the same way.
- Anyone named between them can view the inspection and takes no turn. On a routine checklist, everyone named after the inspector can view it, and the inspector finishes it alone.
The approver's turn is listed in My Approvals and opens the inspection, where the verdicts are recorded. The inspector's turn stays in Inspections.
Rules
One turn at a time
- Only the party whose turn it is can record verdicts — everyone else sees a read-only view
- Each party's verdicts are stored separately and never overwrite another party's
- Verdicts become read-only after submission
- The approver can only approve when there are no failed items and no open issues
Overruling the inspector's Fail
The approver sees the inspector's verdicts and doesn't have to agree with them. To pass an item the inspector failed ("re-measured, 41 mm; the first reading was misread"), the approver presses Pass and writes why in the box that opens under the inspector's note. The reason is required: without it the item can't be saved.
- An overruled Fail no longer counts, so the inspection can be approved.
- A Pass without a reason isn't possible on an item the inspector failed. To agree with the inspector, press Fail.
- Only a later party can overrule. The inspector changes their own answer before submitting instead.
- The overrule is kept in the item's Review History and printed in the PDF: the final Pass is marked Fail overruled with the reason, and the Rework history page shows who overruled it, when and why.
- An issue already raised from that Fail is cancelled with it, so it doesn't hold up the approval. The issue moves to Cancelled, and its history reads "Cancelled: fail overruled by name: reason". An issue that was already closed stays as it is.
- If the inspector fails the item again in a later round, the approver has to look at it again: the earlier overrule doesn't carry over.
What Each Party Sees
| Your Role | What You See |
|---|---|
| Inspector, on your turn | Verdict buttons on every item, evidence upload, notes field |
| Approver, on your turn | The inspector's verdicts on every item + your own verdict buttons |
| Not your turn, or a party who takes no turn | Read-only view — all existing verdicts visible, no verdict buttons. Remind nudges whoever's turn it is |
Completion Outcomes
| Outcome | When | What Happens |
|---|---|---|
| Complete | Routine checklist: the inspector submits | Status → Completed |
| Approved | Quality-critical checklist: the approver approves with no failed items and no open issues | Status → Completed, overallVerdict → Pass |
| Sent back | The approver fails an item, or an item the inspector failed isn't overruled | Reinspection triggered — it goes straight back to the inspector to fix, with the remark on the failed item |
Waiting on Someone
While an inspection is under way, everyone but the person whose turn it is sees a Remind button, followed by that person's name. It sends them a notification in the app and on their phone, and is logged in the inspection's history. The same person can be reminded once every 10 minutes.
Reassigning a Party Slot
If the person in a slot has left the project or can't get to it, hand the slot to someone else instead of starting over. Reassign a slot sits next to Remind on a running inspection, on the web and on the phone. Pick the slot and the new holder, then confirm. A Fixed issue waiting on its reinspection offers the same thing on the issue page as Reassign Performer (named after the slot that's waiting).
- Who can do it: the project owner, whoever created the inspection, and anyone whose role can set up inspections.
- Who can take the slot: any project member who doesn't already hold another slot on this inspection — each party stays a different person. On a quality-critical inspection, the new holder of the last slot must hold the approve permission.
- What moves: only the slot. Verdicts already recorded stay, and the turn stays where it was — if it was that slot's turn, it's now the new holder's. Issues raised from the inspection keep their own assignee.
- The change is logged in the inspection's history, and the new holder is notified.
- A completed or cancelled inspection can't have its parties changed.
Rules that come with the workflow
An inspection keeps the rules of the workflow version it started on. To change them, open the inspection workflow in Admin → Workflows and use Reinspection and evidence rules. Saving sends the change for approval, and a published change applies to inspections started after it.
| Rule | On a new inspection | Effect |
|---|---|---|
| Re-sign-off | Every reviewer | During reinspection, whether every reviewer re-signs each cycle or reviewers with nothing to re-judge are skipped |
| Approver inherits passes | Off | When on, a dedicated Approver's verdicts are pre-filled with Pass for items where all prior parties passed or marked N/A. Applies only when there is a separate Approver after at least one Checker |
| Re-judging | Failed items only, for the inspector and the approver (an admin can set Re-do everything) | How much each party re-judges each cycle. Previous records are always kept and viewable |
| Reinspection limit | None | Limits how many times an inspection can cycle back |
| Photo on a failed item | As each checklist says | Always required or not required overrides the checklist on new inspections |
| Resolve issues before reinspecting | Off | When on, an inspection can't be reinspected while an issue raised from it is still open |
Send-backs always return to the inspector
When a reviewer fails an item, the inspection always goes straight back to the inspector to fix it before any further review — this is built in and not configurable.
Inspections started on an earlier workflow version
An inspection finishes on the workflow version it started on. One that started on an earlier version moves through every party in order: the Performer records the verdicts and presses Submit for Review; each Checker in the middle records their own verdicts and presses Approve & Forward; the Approver, last, presses Approve Inspection. A fail from any of them reads Send back with failures and returns the inspection straight to the Performer — a Checker's send-back does not go on to the Approver. With only two parties, the second is the Checker and Approver in one.
Next Steps
- Verdicts & Evidence — How to record verdicts and manage evidence
- Reinspection — What gets cleared when an inspection cycles back
- Completed View — What the final comparison view looks like
Questions
Does every inspection need an approver?
No. Routine work closes on the inspector's verdict. Only a quality-critical checklist needs an approver, named as the last party, whose role holds the approve permission for inspections.
Can the approver send it back without failing an item?
No. The only way to send an inspection back is to fail an item and submit. It then goes straight to the inspector.
The inspector failed an item by mistake. Does the approver have to send it back?
No. The approver can overrule the Fail: press Pass on the item and write why in the box that opens. The overrule and its reason are kept on the record and printed in the PDF. An issue raised from that Fail is cancelled with the overrule, with the reason in its history, so it doesn't stop the approval.
The approver is away. Can someone else sign off?
Only the person in the approver slot can act on that step, but the slot can be handed over. The project owner, whoever created the inspection, or anyone whose role can set up inspections presses Reassign a slot, then picks the approver slot and a new person who holds the approve permission. Verdicts already recorded stay.
Does a change to the inspection workflow affect inspections already under way?
No. An inspection finishes on the workflow version it started on. A published change applies to inspections started after it.