Issue Lifecycle

How an issue moves from Open to Closed — the two issue workflows, who moves each step, and the reinspection gates.

Issues follow a defined lifecycle with clear rules about who moves them and when they can close. Two people matter on every issue: the assignee, who does the fix, and the verifier, who checks it — the person who raised the issue, or anyone whose role can approve issues. On an issue raised from an inspection, the check is the inspection's reinspection. What unlocks Closed depends on where the issue came from, not on its category.

Issues — manage defect resolution with status tracking

Two Issue Workflows

Your company runs two issue workflows. An issue keeps the workflow it started on until it closes, and its page only ever offers the buttons that workflow allows — so you never have to work out which one you are on.

WorkflowStatusesUsed by
StandardOpen → Fixed → Closed, plus Void, Duplicate and CancelledEvery issue you raise
With an In Progress stepOpen → In Progress → Fixed → ClosedIssues that started on it, until they close

The Standard Workflow

text
FromToWho can do itHow
OpenFixedThe assignee onlyRow menu or issue page → Mark Fixed
OpenClosedThe person who raised it, or the assignee — only on an issue raised by handIssue page → Fixed on the spot, with one photo of the finished work
FixedClosed (raised from an inspection)SystemAutomatic when the Performer submits the reinspection
FixedClosed (raised by hand)The verifierRow menu or issue page → Verify
FixedOpen (fix not good enough)The verifierIssue page → Send back, with a reason
Open or FixedVoid or DuplicateThe person who raised it, the project owner, or anyone whose role hands out workIssue page → Void or Duplicate, with a reason
Open or FixedCancelled (raised from an inspection)SystemAutomatic when a later party overrules the Fail that raised it; the history reads "Cancelled: fail overruled by name: reason"

Your role must also allow moving issues. Corrective notes and fix evidence belong to the assignee while the fix is under way.

The assignee's row menu on an Open issue offers Mark Fixed
An issue raised from an inspection: the assignee marks it Fixed, and the reinspection closes it

Fixed on the spot

When a defect takes a minute to put right, there is no need to mark it Fixed and wait for someone to verify it. On an Open issue you raised or are assigned to, press Fixed on the spot and add a photo of the finished work. The issue closes straight away. It isn't offered on an issue raised from an inspection, because that issue is checked by the inspection's reinspection.

Void, Duplicate and Cancelled

Void closes an issue that turned out not to be a defect; Duplicate closes one that is already raised elsewhere. Both ask for a reason, which shows in the issue's history, and both count as resolved in the register.

Cancelled is set only by the system, never from the issue page: an issue raised from an inspection Fail moves there when a later party overrules that Fail. It counts as resolved too, and its history keeps who overruled and why.

Sending a fix back

If the work marked Fixed is not good enough, the verifier presses Send back on the issue page instead of Verify. A reason is required; it is saved with the move and shows in the issue's history, so the assignee knows what is still wrong. The issue goes back to Open, ready for the assignee's next Mark Fixed.

The Workflow With an In Progress Step

text
FromToWho can do itHow
OpenIn ProgressThe assignee onlyRow menu or issue page → Start Fix
In ProgressFixedThe assignee onlyRow menu or issue page → Mark Fixed
FixedClosed (raised from an inspection)SystemAutomatic when the Performer submits the reinspection
FixedClosed (raised by hand)Assignee, creator, or project ownerRow menu or issue page → Close Issue
FixedIn Progress (fix rejected)The Performer, when it is their turn to re-inspect. On an issue raised by hand: the assignee, creator, or project ownerIssue page → Reject Fix, with a reason

Reject Fix works like Send back: a reason is required and shows in the issue's history as "Fix rejected", and the issue goes back to In Progress. On an issue raised from an inspection, only the Performer sees it, and only when it is their turn to re-inspect. A reviewer or approver never rejects a fix: while the inspection is with them they judge it on the inspection, and send it back to the Performer if the work is not right.

Once rework is done, Mark Fixed moves the issue to Fixed

Who Fixes It

Picking the fixer when you raise an issue

When you fail an item and pick Raise an issue on the fail page, Who fixes it and Due date appear under it (web and phone alike). Pick any project member — the Performer too. Leave it empty and the issue is raised with no assignee.

Issues from the bulk Create issues for N remaining failed items button (on the phone, Raise issues for N remaining failed items) always start with no assignee.

Needs assignee

An issue with no assignee shows in the Needs assignee view of the issues register, on the web and on the phone. When one is raised from an inspection, the project owner and the people who hand out work (by default the project manager and the superintendent) get a notification asking them to assign it.

Changing who fixes it

The project owner, the assignee and the person who raised the issue can change its Assignee on the issue page, and so can anyone whose role hands out work. Changing the assignee changes nothing on the inspection: whose turn it is to re-inspect stays the same.

Closure Rules in Detail

Rule 1: Closure Depends on Source

What decides the path is whether the issue was raised from an inspection. An inspection-raised issue closes through the reinspection: the register's close action (Verify or Close Issue) is locked on any issue that has a source inspection, and clicking it routes you to the detail page instead. An issue raised by hand closes as soon as it is verified from Fixed.

Rule 2: All Siblings Must Be Fixed

Issues from the same inspection are treated as a group ("siblings"). No individual issue can close until ALL siblings are Fixed or already Closed. This prevents partial resolution.

Example:

  • Inspection "Pre-Pour Check" generates 3 issues: I-001, I-002, I-003
  • I-001 is Fixed, I-002 is Fixed, I-003 is still Open
  • None can close yet — I-003 must also reach Fixed status

Rule 3: Auto-Close on Reinspection

When:

  1. Every linked issue has been fixed by its assignee
  2. The Performer has re-inspected and recorded new verdicts on the previously failed items
  3. The Performer has submitted

The system transitions every issue linked to that inspection that is already in Fixed to Closed. Issues not yet Fixed are not closed — the Performer cannot submit the reinspection until all of them are Fixed. Issues linked to a different inspection, or to none, are untouched.

How the Interface Guides You

The app makes these prerequisites visible rather than silently blocking you, and it never shows you a button you can't use.

Issue Detail Page

When an issue is Fixed and linked to a source inspection, a "Before you can close this issue" checklist block appears above the form content. It shows two ordered steps:

Step 1 — Fix all related issues Shows live progress (e.g., "2 of 3 fixed"). If siblings are still not fixed, each one is listed as a clickable row — tap any to navigate directly to that issue without losing your place.

Step 2 — Complete the reinspection This step is dimmed until Step 1 is fully complete. Once all siblings are Fixed, the Performer gets a Perform Reinspection button inside the step when it is their turn. While the inspection is still with a reviewer, nobody gets the button: the reviewer judges it on the inspection first. Everyone else sees whose turn it is instead.

A move that needs something first — a reason for Send back, Reject Fix, Void or Duplicate, or a photo for Fixed on the spot — opens a short dialog on the issue page. The reason shows in the issue's history.

Waiting on someone

When the next step belongs to someone else, the bottom of the issue page says who you are waiting for:

You seeMeans
"Waiting for name to start the fix." / "…to finish the fix."The issue is with its assignee
"Nobody is assigned to fix this yet — assign someone to start the fix."It has no assignee — change the Assignee to get it moving
"Waiting for name (Performer) to submit the reinspection."The fix is done and it's that person's turn on the inspection
"Waiting for name (Approver) to finish reviewing the inspection. Then name (Performer) submits the reinspection."The inspection is still with a reviewer; it comes to the Performer after that

While you wait on a reinspection, two buttons may sit beside the line:

  • Remind sends the person whose turn it is a notification, in the app and on their phone. The same person can be reminded once every 10 minutes.
  • Reassign Performer (named after the slot that's waiting) hands that turn to another project member — see Reassigning a party slot. It shows only to people who can manage the inspection.

On the phone the same line, Remind and Reassign Performer sit in a banner on the issue page, and Perform reinspection shows only to the person whose turn it is.

Issues Table (row actions)

The row menu offers only the moves that need nothing typed. A move that needs a reason or a photo lives on the issue page. When the close action is blocked in the row menu, it displays a lock icon instead of being grayed out, and hovering shows a tooltip. Clicking it navigates you to the detail page where you can see and act on the prerequisites — it's never a dead-end no-op.

Reinspection Gate

The Performer can never submit a reinspection while a linked issue is not yet Fixed — every one must be Fixed first. This always applies. When the inspection passes, every linked issue marked Fixed closes automatically — including on a single-party inspection that was never sent back.

On top of that, if your company's inspection workflow has the Resolve issues before reinspecting rule switched on, Reinspect on a completed inspection is refused until every linked issue is Fixed or Closed:

ConditionCan Reinspect?
All linked issues Fixed, Closed or cancelled✅ Yes
Any linked issue is Open or In Progress❌ No — blocked

A Fixed issue doesn't block it: that reinspection is exactly what closes it. The Performer sees a message with the number of unresolved issues that must be resolved first.

Typical Lifecycle Example

1

Defect Identified

During inspection, the Performer marks "Rebar spacing" as Fail, picks Raise an issue on the fail page and picks the steel fixer's foreman in Who fixes it. A Quality issue is created: "Rebar spacing — 180mm measured, 150mm required" → Status: Open, assigned to the foreman.

2

Fix Complete

The foreman is notified and the rebar is repositioned to the correct spacing. The foreman clicks Mark Fixed → Status: Fixed. All sibling issues from this inspection must also reach Fixed status.

3

Reinspection Verifies

The Performer re-inspects the items (reinspection cycle). The project manager watching the issue sees "Waiting for name (Performer) to submit the reinspection" and can press Remind. When the Performer submits the reinspection, the Fixed issues linked to that inspection transition to Closed. If the rework still isn't right, the issue is sent back with a reason instead, and it goes back to the foreman.

A Fixed issue waits for the reinspection before it can close

Priority Impact

Priority doesn't affect the lifecycle mechanics but provides urgency signals:

PriorityTypical Response
CriticalImmediate action — safety issues, stop-work items
HighSame-day response — blocking other trades or work
MediumStandard rework timeline — 1-3 days
LowCan be bundled with other work — cosmetic fixes

Overdue items (past due date) show visual indicators in the table.

Next Steps

  • Issues Overview — Table layout, categories, filtering, and management
  • Reinspection — How the reinspection cycle works with issue resolution

Questions

Why is the close button locked?

The issue came from an inspection, so it isn't closed by hand. Once it's Fixed, it closes on its own when the inspection passes, or when the Performer submits the reinspection with every issue from that inspection Fixed. The issue's page shows what's left. If the approver overrules the Fail that raised it, the issue is cancelled on its own instead.

Why does one issue show Start Fix and another doesn't?

They are on different issue workflows. An issue keeps the workflow it started on: the standard one goes straight from Open to Fixed, the other has an In Progress step first. Each issue's page shows only the buttons its own workflow allows.

I'm the project owner. Why can't I mark it fixed?

Fixing belongs to the issue's assignee alone. Change the Assignee on the issue page to the person who should fix it. If nobody is assigned, the issue sits in Needs assignee until you pick someone.

Why can't I use Fixed on the spot on this issue?

It was raised from an inspection, so the inspection's reinspection checks the fix. Fixed on the spot is only for an issue raised by hand, and only for the person who raised it or its assignee.

The Performer has left the project. How does the reinspection get done?

Someone who can manage the inspection — the project owner, whoever created it, or anyone whose role can set up inspections — presses Reassign Performer on the issue page (or Reassign a slot on the inspection) and picks another project member. The new person is notified and can re-inspect. The issue keeps its assignee.

Who gets notified when an issue changes status?

The assignee, when someone else moves it on.

What happens to an inspection issue if the inspection is deleted?

It stays in the register with its history, and it can still be closed. Closing normally waits for the inspection's reinspection; once the inspection is deleted or cancelled, a Fixed issue can move straight to Closed.